Mittlerweile gibt es jetzt auch die Timeline der Mission:
01.04.2012 07:04:00 [L-10:25:04] External tank ready for loading
01.04.2012 07:22:00 [L-10:07:04] Mission management team tanking meeting
01.04.2012 08:04:00 [L-09:25:04] Resume countdown (T-minus 6 hours)
01.04.2012 08:04:00 [L-09:25:04] LO2,
LH2 transfer line chilldown
01.04.2012 08:14:00 [L-09:15:04] Main propulsion system chill down
01.04.2012 08:14:00 [L-09:15:04]
LH2 slow fill
01.04.2012 08:44:00 [L-08:45:04] LO2 slow fill
01.04.2012 08:49:00 [L-08:40:04] Hydrogen
ECO sensors go wet
01.04.2012 08:54:00 [L-08:35:04] LO2 fast fill
01.04.2012 09:04:00 [L-08:25:04]
LH2 fast fill
01.04.2012 10:59:00 [L-06:30:04]
LH2 topping
01.04.2012 11:04:00 [L-06:25:04]
LH2 replenish
01.04.2012 11:04:00 [L-06:25:04] LO2 replenish
01.04.2012 11:04:00 [L-06:25:04] Begin 2-hour 30-minute built-in hold (T-minus 3 hours)
01.04.2012 11:04:00 [L-06:25:04] Closeout crew to white room
01.04.2012 11:04:00 [L-06:25:04] External tank in stable replenish mode
01.04.2012 11:07:00 [L-06:22:04] Ascent flight control team on console
01.04.2012 11:19:00 [L-06:10:04] Astronaut support personnel comm checks
01.04.2012 11:49:00 [L-05:40:04] Pre-ingress switch reconfig
01.04.2012 12:59:00 [L-04:30:04] Final crew weather briefing
01.04.2012 13:09:00 [L-04:20:04] Crew suit up begins
01.04.2012 13:34:00 [L-03:55:04] Resume countdown (T-minus 3 hours)
01.04.2012 13:39:00 [L-03:50:04] Crew departs O&C building
01.04.2012 14:09:00 [L-03:20:04] Crew ingress
01.04.2012 14:59:00 [L-02:30:04] Astronaut comm checks
01.04.2012 15:24:00 [L-02:05:04] Hatch closure
01.04.2012 15:54:00 [L-01:35:04] White room closeout
01.04.2012 16:14:00 [L-01:15:04] Begin 10-minute built-in hold (T-minus 20m)
01.04.2012 16:24:00 [L-01:05:04]
NASA test director countdown briefing
01.04.2012 16:24:00 [L-01:05:04] Resume countdown (T-minus 20m)
01.04.2012 16:25:00 [L-01:04:04] Backup flight computer to OPS 1
01.04.2012 16:29:00 [L-01:00:04] KSC area clear to launch
01.04.2012 16:35:00 [L-00:54:04] Begin final built-in hold (T-minus 9m)
01.04.2012 17:00:00 [L-00:29:04] NTD launch status verification
01.04.2012 17:20:04 [L-00:09:00] Resume countdown (T-minus 9m)
01.04.2012 17:21:34 [L-00:07:30] Orbiter access arm retraction
01.04.2012 17:24:04 [L-00:05:00] Launch window opens
01.04.2012 17:24:04 [L-00:05:00] Hydraulic power system (
APU) start
01.04.2012 17:24:09 [L-00:04:55] Terminate LO2 replenish
01.04.2012 17:25:04 [L-00:04:00] Purge sequence 4 hydraulic test
01.04.2012 17:25:04 [L-00:04:00] IMUs to inertial
01.04.2012 17:25:09 [L-00:03:55] Aerosurface profile
01.04.2012 17:25:34 [L-00:03:30] Main engine steering test
01.04.2012 17:26:09 [L-00:02:55] LO2 tank pressurization
01.04.2012 17:26:29 [L-00:02:35] Fuel cells to internal reactants
01.04.2012 17:26:34 [L-00:02:30] Clear caution-and-warning memory
01.04.2012 17:27:04 [L-00:02:00] Crew closes visors
01.04.2012 17:27:07 [L-00:01:57]
LH2 tank pressurization
01.04.2012 17:28:14 [L-00:00:50]
SRB joint heater deactivation
01.04.2012 17:28:33 [L-00:00:31] Shuttle GPCs take control of countdown
01.04.2012 17:28:43 [L-00:00:21]
SRB steering test
01.04.2012 17:28:57 [L-00:00:07] Main engine start (T-6.6 seconds)
01.04.2012 17:29:04 [L-00:00:00]
SRB ignition (LAUNCH)
01.04.2012 17:29:14 [L+00:00:10] Start roll maneuver
01.04.2012 17:29:42 [L+00:00:38] Start throttle down
01.04.2012 17:29:56 [L+00:00:52] Start throttle up
01.04.2012 17:30:03 [L+00:00:59] Max Q
01.04.2012 17:31:09 [L+00:02:05]
SRB staging
01.04.2012 17:31:19 [L+00:02:15]
OMS assist
01.04.2012 17:32:51 [L+00:03:47] Negative return (end of RTLS possibility)
01.04.2012 17:34:51 [L+00:05:47] Roll to heads up
01.04.2012 17:37:28 [L+00:08:24]
MECO (Main Engines Cut Off)
01.04.2012 17:37:48 [L+00:08:44]
ET separation
01.04.2012 18:00:45 [L+00:30:56] NC-1 rendezvous rocket firing
01.04.2012 18:30:51 [L+01:01:47] NC-2 rendezvous rocket firing
01.04.2012 18:41:19 [L+01 12:15] DOCKING
01.04.2012 18:54:27 [L+01 25:23]
SSRMS grapples
MPLM01.04.2012 19:03:41 [L+01 34:37]
SSRMS installs
MPLM01.04.2012 19:13:41 [L+01 44:37]
SSRMS Radiator
01.04.2012 19:23:53 [L+01 54:49] UNDOCKING
01.04.2012 19:30:04 [L+02 01:00] Deorbit ignition
01.04.2012 19:53:13 [L+02 24:09] Landing at EDWARDS
AFBLandung in Edwards, coool!
Gruß, Klaus